Dashboard

Company operations overview

--:--:--Loading time…
Full AdminAll controls
Logout
OPERATIONS COMMAND CENTER

Sarvaviyaabi Sai Traders

One clear view of supplier and client contacts, purchase verification, raw-material stock, Chinthapalli production, finished powder, sales, employees and daily follow-up.

Today-Daily operating overview
System Data0 recordsPurchases, sales, production, employees and contacts
Raw Material StockRM
0 kg
KVS and Chinthapalli combined
Finished PowderFP
0 kg
All available finished mesh
Today ProductionPR
0 kg
No machines recorded today
Today SalesSL
0 kg
0 sales entries
Month Purchase Value
₹0
0 purchase entries this month
Material Mismatch!
0
No purchase mismatch
Active EmployeesEM
0
Attendance not marked today
Low Stock AlertsAL
0
No low-stock alert
Maintenance AttentionMT
0
No open maintenance
Today ExpensesEX
₹0
No expense entry today
Month ExpensesME
₹0
0 entries this month

Today’s Operating Status

Live summary from saved records
PRProductionNo machine entry0 kg
SLSalesNo sales entry0 kg
PUPurchasesNo purchase entry₹0
ATAttendanceNot marked0 / 0
RQSales Follow-upNo requirement due0
MTMachine MaintenanceNo maintenance scheduled0
EXExpensesNo expense entry₹0

Raw-Material Snapshot

Combined available stock
Titanium Scrap0 kgActual material stock
Aluminium Scrap0 kgActual material stock
SS Scrap0 kgActual material stock
Mismatch Stock In0 kgReceived under mismatch bills

Chinthapalli Finished Powder

Available by type / grade

Expense Overview

Live company expense position
Today₹00 entries
Current Month₹00 entries
All Expenses₹00 entries
Bill Pending0Expenses marked bill No

Recent Expense Details

Latest five saved expense entries
DateCategoryPaid ToAmountBill

Low Stock – Action Required

Items at or below their minimum level
0
ItemUnit / TypeGrade / MeshBalanceMinimumStatusControl
PURCHASE CONTROL

Invoice-to-Stock Purchase Verification

Save the supplier bill name separately from the material physically received. Bill reports use Bill Material Name; stock uses Actual Material Received.

1 Invoice2 Verify Material3 Add Stock
Total Purchases0Saved purchase records
Matched Purchases0Bill and actual material same
Mismatch Purchases0Bill and actual material differ
Bill Pending0Bill Received marked No

New Purchase Entry

Complete the three sections in order. GST and total are calculated automatically.
1

Invoice Details

Information printed on the supplier bill

2

Material Verification

Compare the bill with the material received

?
Select both material names

The system will automatically mark the purchase as matched or mismatched.

Bill: Not selected   Actual: Not selected
3

Stock & Quantity

Stock is posted under actual material received

Card & table grouping: Bill Material Name
Raw stock addition: Actual Material Received
GST total: Quantity × Rate + GST

Purchases by Bill Material Name

Every card uses only the supplier bill material name. Mismatch quantity remains inside the same bill-name card and is shown separately.

Purchase Records

Red rows are mismatches. Cards and Bill Material filter use only Bill Material Name.
DateInvoice / SupplierBill Material Name
Card & filter
Actual Material Received
Stock source
VerificationQuantityRate / GST / TotalStock UnitBillActions
BUSINESS CONTACT MASTER

Supplier & Client Details

Maintain supplier and client records in one control. Saved names become selectable in Purchase, Sales Powder, Upcoming Requirements and Bill Uploads.

1 Add Details2 Use in Entries3 Update Anytime
Total Records0Suppliers and clients
Suppliers0Purchase source contacts
Clients0Sales and requirement contacts
Active / GST0 / 0Active and GST-registered

Add Supplier / Client

One form for both supplier and client master details
1

Profile & Contact

Primary identity and communication details

2

Identity, Tax & Address

GST, PAN, Aadhaar and registered communication address

3

Business & Payment

Material, requirement and commercial follow-up

Connected master dataThe saved name will appear as a suggestion in related purchase and sales controls.

Supplier & Client Master List

Search, filter, edit, export or delete saved business contacts
CodeTypeName / ContactPhone / EmailGST / PAN / AadhaarLocationBusiness / PaymentStatusActions
S

Combined Stock Control

Manage Raw Material and Powder Stock for KVS and Chinthapalli units from one control.

Raw Material Stock Command Center

Current balances are calculated from actual material received, transfers, adjustments and stock consumption.

Overall: 0 kg0 kg0 kg0

Raw Material Manual Entry & Return

Add manual stock, record supplier return, or correct a raw-material balance

Return Raw Material reduces the selected raw-material stock immediately. The system prevents a return quantity greater than the available balance.

DateUnitRaw MaterialEntry TypeQuantityStock ImpactPurpose / PersonAction

Raw Material Stock Ledger & Balance

0
UnitActual Raw MaterialUOMMatched Purchase InMismatch Purchase InUnverified Purchase InTransfer / Adjustment InTotal Stock InReturn Raw MaterialTotal Stock OutCurrent BalanceStatusAction
KVS Powder Stock
0 kg
Overall Powder Stock
0 kg
Kappi Powder
0 kg
Fine Powder
0 kg
Wastage Powder
0 kg

Mesh-wise Powder Stock

Detailed KVS mesh stock with compact production powder counts
Production Powder Count Compact Chinthapalli output totals without the large unit card
Kappi Count0.000 kgProduction unit balance
Fine Powder Count0.000 kgAll finished mesh categories
Wastage Powder Count0.000 kgProduction wastage balance
+ Manual Mesh-wise Powder Entry Click to open manual stock in, stock out and balance correction Open Entry

Manual Powder Stock Entry

Add, reduce or correct powder stock for every approved mesh category

Select the unit and exact mesh name. Manual stock in, stock out and adjustments update the summary cards and powder balance table immediately.

Kappi40 Mesh60 Mesh Local60 Mesh Kaliswari80 Mesh North80 Mesh Kaliswari80 Mesh Non Magnetic80 Mesh Magnetic90 Mesh100 MeshCandle 180+Candle 180-180 MixingWastage Powder
DateUnitMesh CategoryEntry TypeQuantityStock ImpactPurpose / PersonAction

Powder Sorting Entry – Manual Feed

Feed is checked against live stock and all output weights must reconcile exactly
Select the powder stock used as feed. The entered feed cannot exceed its available stock. The system accepts the entry only when Feed Weight = Total Powder Output.

Powder Output Categories

Total Powder Output0.000 kg
Total Accounted Output0.000 kg
Feed Difference0.000 kg
Stock After Feed0.000 kg
DateUnit / FeedFeed180 MixingTotal SortedCategory BreakdownSorterAction

Powder Stock Balance

0
UnitPowderMeshUOMStock InStock OutBalanceStatusAction
Purchase Bills 0 Uploaded purchase documents
Sales Bills 0 Uploaded sales documents
Total Files 0 PDF and image files
Cloud File Size 0 MB Approximate attachment size

Manual Purchase & Sales Bill Upload

Upload JPG, PNG, WEBP or PDF bills and optionally link them to an existing record
Cloud-safe upload: Images are compressed automatically. PDF files must be 1.5 MB or less. You can select multiple files for the same bill details.
No files selected.
Ready

Uploaded Purchase & Sales Bills

Type Bill Date Bill No. Supplier / Customer Amount File Linked Record Uploaded Actions
Open Requirements0
Overdue0
Due in 7 Days0
Required Quantity0.000 kg

Update Upcoming Sales Requirement

Create and update expected customer powder requirements

Upcoming Sales Requirements

Expected DateCustomerPowder RequirementPriorityStatusSales StockReminderAssigned / NotesActions
Total Sold Quantity0.000 kgAll recorded powder sales
Customers0Unique customer names
Packing Used0Material quantity used in sales
Sales Entries0Total recorded sales

Sales Powder Entry

Aligned powder selection, customer details and packing-material stock control
Saving a sale deducts the selected powder quantity and all selected packing materials such as drums, inner covers, outer bags, labels and tape. Stock is restored automatically when a sale is deleted.
Available Powder0.000 kg
Powder After Sale0.000 kg
Selected PowderNot selected

Packing / Material Stock Used

No packing material selected.

Sales Powder Records

DateCustomerUnit / PowderQuantityMaterials UsedTransport / PersonActions

Stock Transfer Voucher / Delivery Challan

GSTIN: 33AYRPS7034B1ZC · KVS Unit ↔ Chinthapalli Production Unit
Correct stock flow: KVS raw material → Chinthapalli production → Chinthapalli finished powder → KVS finished stock. Saving the bill reduces the sending unit and increases the receiving unit automatically.

Stock Transfer Voucher History

DateBill No.FromToItemQuantityVehicleIssued / ReceivedActions
Drums in Stock
0
Packing Items
0
Other Materials
0
Low Stock Items
0
Expense Value
₹0

Material / Expense Entry

Drums, packing items, spares, consumables and other expenses

Current Material Stock

CategoryItemUnitStock InUsed / OutBalanceStatus

Material & Expense History

DateCategoryItemEntryQtyTotalSupplierBillPersonActions
Today Expense ₹0.00 0 entries today
All Expenses ₹0.00 All saved expense records
Displayed Entries 0 Rows matching the selected filters
Bill Received 0 Displayed expenses with bill received
Bill Pending 0 Displayed expenses marked bill No

Company Expense Entry

Record manufacturing, transport, labour, utility and office expenses separately

Expense Register

All expense records
Date Voucher Unit Category Paid To Amount Payment Bill Person / Remarks Actions
NEW OPERATIONS CONTROL

Machine Maintenance & Breakdown Control

Schedule preventive service, record breakdowns, track technicians, parts, downtime, repair cost and the next service date for all production equipment.

Machines Covered6Machine 1–5 + Filter Sewing
Default UnitChinthapalliProduction and support equipment
Service TrackingActiveDue and overdue alerts
Cloud StorageIncludedNo SQL change required

Service Due & Breakdown Alerts

Latest next-service date for each machine and active critical work

Equipment Health

Add Maintenance / Breakdown Record

Use one entry for service, repair, inspection, cleaning or calibration
New Record
Tip: For a breakdown, select Breakdown Repair, set the priority and record start/end time. Downtime is calculated automatically and can still be edited.
Downtime: 0.00 hours

Maintenance & Breakdown History

All saved records
DateMachine / UnitType / PriorityIssue & WorkAssigned ToDowntimeCostNext ServiceStatusActions

Simple Five-Machine Production Control

Select hour, minute and AM/PM — all production times use 12-hour format

Machine 1

0.000
Editable start time
Editable end time
0h 00m

Machine 2

0.000
Editable start time
Editable end time
0h 00m

Machine 3

0.000
Editable start time
Editable end time
0h 00m

Machine 4

0.000
Editable start time
Editable end time
0h 00m

Machine 5

0.000
Editable start time
Editable end time
0h 00m
Ready to save

Production Records

DateMachineOperatorRaw InputPowder Type BeforeAfterTotalStartEnd BreakWorkingReasonStatusAction
EMPLOYEE CONTROL

Employee Profile & Workforce Records

Create each employee record through a clear three-step workflow. Employment, personal and bank information continue to use the existing saved-data structure.

1 Work Profile2 Personal Details3 Bank Details
Total Employees0All saved employee records
Active Employees0Currently active workforce
Permanent Workers0Permanent employment records
Temporary Workers0Temporary employment records

Add New Employee

Complete the three cards below. Aadhaar and bank numbers remain masked in the employee list.
PH
Employee PhotoUpload a clear passport-style or profile photo. The image is compressed before saving.
1

Employment Details

Identity, unit, designation and work status

2

Personal & Contact Details

Communication, Aadhaar and residential details

3

Bank Account Details

Salary, account and payment information

Employee record readyRequired fields: Employee ID, Employee Name, Role and Work Type.
EM

Employee Directory

Search and filter employees. Aadhaar and bank account numbers are masked.
IDEmployee / PhotoUnit / RoleWork TypePhoneAadhaarBank AccountJoining DateStatusActions
Employees Loaded 0 Active employees in current filter
Present 0 Full-day attendance
Half Day 0 Half-day attendance
Absent 0 Employees not present
OT Employees 0 Employees with overtime
Saved Records 0 Records already saved for date

Daily Employee Attendance

Set Present, Half Day or Absent for every employee, then add OT and OT Hours when applicable
Ready

Attendance History

Date Employee ID Employee Unit Work Type Status OT Remarks Saved Actions
ADMIN-ONLY SECURITY CONTROL

Login & Unit Access Control

Connect separate Supabase login accounts to the same company database and assign Full Admin, Production Manufacturing Unit or KVS Unit access.

Before adding a unit login
  1. Create the email user in Supabase Authentication → Users.
  2. Run the included V68 role-login SQL once.
  3. Enter the same email below and assign its unit role.

Add or Update Unit Login

The Auth user must already exist in Supabase
Full Admin Only

Authorised Unit Login Accounts

Loading access records…
UserEmailRoleStatusWorkspaceActions
Ready 0
Base Amount₹0.00
GST Amount₹0.00
Total Amount₹0.00

Business Reports

All saved records are displayed by default. Select dates only when you need a specific period.

Showing all saved records

Sales Powder Summary

DateCustomerPowderQuantityMaterials Used

Purchase Summary

DateSupplierMaterialQtyTotalBill

Production Summary

DateMachineOperatorPowderTotalWorking

Machine Maintenance Summary

DateMachineTypeIssue / ServiceDowntimeCostStatus

Transfer Voucher Summary

DateVoucherFromToItemQuantity

Material Stock Summary

DateCategoryItemEntryQuantityTotalBill

Company Expense Summary

DateVoucherUnitCategoryPaid ToAmountBill